Accessory dwelling units are Eugene's smartest move — for aging parents, rental income, a home office, or the kid who isn't quite ready to leave. The trick is making something small feel architecturally complete, not like a shed with insulation. I know the city's ADU rules cold, including the pre-approved Domino design that skips most of the permitting wait.
Eugene ADU code, memorized
Setbacks, size limits, SDC waivers — I navigate it so you don't have to.
Small but complete
Real architecture at 400–800 sf, not a glorified shed.
A pre-approved option
The Domino ADU is already approved by the city — skip the line.
Do I need to live on the property?
No. Eugene dropped the owner-occupancy requirement, so an ADU can be a pure rental.
How long does permitting take?
A custom ADU can take 6–8 months through permitting. The pre-approved Domino skips most of that.